Name: “Poggio Montone” geothermal exploration project
Client: Sorgenia Geothermal
Target: Electric Power Generation (ORC Unit)
Area: 58.05 km2
Dates: 2011 – to date
Project Summary:
Accomplished activity: geological, hydrogeochemical and geochemical survey, seismic, gravity and magnetotelluric survey. Next exploration steps: temperature gradient drilling, EIA
Role of Terra Energy:
Permitting, geological, hydrogeochemical (water and gases) and geochemical (CO2 soil flux) field and laboratory work, integration of all exploration data (conceptual model), 3D reservoir modeling, numerical simulations, gravity interpretation.