Name: "Le Cascinelle” geothermal exploration project

Client: Sorgenia Geothermal

Target: Electric Power Generation (ORC Unit)

Area: 50.44 km2

Dates: 2011 - to date

Project Summary:

Accomplished activity: geological, hydrogeological and geochemical survey, seismic, gravity and magnetotelluric survey.

Next exploration steps: temperature gradient drilling, EIA.


Role of Terra Energy:

Permitting, geological, hydrogeochemical (water and gases) and geochemical (CO2 soil flux) field and laboratory work, integration of all exploration data (conceptual model), 3D reservoir modeling, numerical simulations, gravity interpretation.